Location: | Clarence Road, Kedron, Queensland |
---|---|
Client: | Thiess John Holland JV |
Status: | Completed September, 2011 |
Value: | $11 Million |
Capability: | Construction |
---|---|
Sector: | Commercial |
Service: | Construct Only |
The FKG Group’s construction of The Airport Link Operations Centre was part of the landmark infrastructure project for the design and construction of the Airport Link Upgrade. Functioning as a customer service centre, customer call centre, tunnel control centre, and operations and maintenance facility with room for the BrisConnections administration office, the ALOC facility provides 24-hour surveillance and safe operation of the toll road. The site was located in a “live” and extremely tight location with difficult access. The FKG Group endeavoured to ensure minimal disruption to traffic on the busy surrounding roads through extensive preplanning of works and liaison with stakeholders.
Mainfreight Larapinta
Distribution Street, Larapinta, Queensland
The Mainfreight Facility project involved the development of an owner-occupied industrial facility on an existing vacant site located in Larapinta, south of Brisbane. It was design...
Siganto And Stacey Factory And Offices
Curzon Street, Tennyson, Queensland
The FKG Group was engaged to design and construct a purpose-built industrial complex at Tennyson in Brisbane. The project involved the construction of a 5,040m² factory featuring ...
Hastings Deering Brisbane Branch
Archerfield, Brisbane, Queensland
Hastings Deering contracted the FKG Group to refurbish an existing office. Works included alterations to two separate areas; the 2,000m² office space and the 6,000m² warehouse. T...