Location: | Samphire Road, Townsville, Queensland |
---|---|
Client: | Department of Defence |
Status: | Completed July, 2020 |
Capability: | Civil Engineering |
---|---|
Sector: | Defence, Government |
Service: | Design and Construct Services |
The FKG Civil Team was engaged by Augility to complete the Ross Island Barracks Hardstand and Landship Crane Project in Townsville. This work involved the demolition and reconstruction of the hardstand and boat ramp, recommissioning of the existing cathodic protection system and the replacement of the existing landship simulator crane.
A large portion of the success of the hardstand was the team’s ability to shorten the expected program, significantly reducing the impact to Defence capability. The supply and installation of a new Italian crane involved designing a custom-built control stand for the Landship Training Simulator.
There were a number of unique challenges on this project including redesigning the pavement to reduce material disposal to less than 1% of the original scope and designing the control stand working through long delays due to COVID 19 and the crane coming all the way from Italy.
North QLD ADF HARDSTAND AND BOAT RAMP
Townsville, Queensland
The Department of Defence engaged the FKG Group, to complete civil works at an ADF base in North Queensland.
HMAS CAIRNS ELECTRICAL UPGRADE
Portsmith, Cairns, Queensland
The FKG Group was engaged by the Department of Defence to undertake the upgrade and refurbishment of electrical infrastructure at HMAS Cairns.
RAAF BASE AMBERLEY HV UPGRADE
Amberley, Queensland
The FKG Group were engaged by the Department of Defence to upgrade High Voltage systems at RAAF Base Amberley.