Location: | Toowoomba, Queensland |
---|---|
Client: | Major Pipeline Operator |
Status: | Completed March, 2011 |
Value: | $100,000 |
Capability: | Civil |
---|---|
Sector: | Energy and resources |
Service: | Construct Only |
Following the 2011 floods, the Toowoomba Range experienced landslips requiring an extensive clean-up process. As a result of the floods, a 20m section of high pressure gas pipeline was exposed. To ensure the gas supply to south-east Queensland was not compromised, the FKG Group was engaged to undertake emergency repair works, deploying staff within hours. The team successfully collaborated with the client to determine, solutions and priorities by identifying potential issues well in advance.
Woleebee CPP
Woleebee Creek, Queensland
As part of QGC’s ongoing works to extract coal seam gas (CSG) from the Surat region, they have been constructing a number of central processing plants (CPPs) to aid in processing...
Wandoan Interconnect
Wandoan, Queensland
Origin Energy identified a need to construct a conduit for the controlled transfer and meter of LNG from the Surat Basin to Gladstone, as part of the APLNG project. The FKG Group w...
Santos Capacity Upgrade
Roma, Queensland
As part of Santos Ltd’s US $18.5 Billion GLNG Coal Seam Gas Venture, a number of upgrade works were required to enhance the company’s LNG delivery capability. The FKG Group was...