The FKG Group was contracted to undertake the site preparation and civil components of the Kogan Creek Solar Boost project across a 30-hectare site.
Works included clearing, grubbing, topsoil stripping, construction of six significant concrete culverts, installation of 1,736 in situ concrete bored piles and associated works, and drainage installation (to interface with existing systems).
The project also involved the construction of solar steam generator pads, perimeter fencing and roadways and required the relocation of 11KVA cables, fibre optic cables and a fly ash pipeline from the middle of the site.
Crush Creek Substation
Colinsville, Queensland
The FKG Group was engaged by UGL Engineering to complete the concrete works for the new Crush Creek Substation, which formed part of the network upgrade to integrate new solar farm...
Woleebee CPP
Woleebee Creek, Queensland
As part of QGC’s ongoing works to extract coal seam gas (CSG) from the Surat region, they have been constructing a number of central processing plants (CPPs) to aid in processing...
Wandoan Interconnect
Wandoan, Queensland
Origin Energy identified a need to construct a conduit for the controlled transfer and meter of LNG from the Surat Basin to Gladstone, as part of the APLNG project. The FKG Group w...