Kogan Creek Solar Boost

Location: Brigalow, Queensland
Client: Areva Solar KCP
Status: Completed September, 2012
Value: $16.5 Million
Capability: Civil Engineering
Sector: Utilities, Energy and resources
Service: Construct Only

The FKG Group was contracted to undertake the site preparation and civil components of the Kogan Creek Solar Boost project across a 30-hectare site.

Works included clearing, grubbing, topsoil stripping, construction of six significant concrete culverts, installation of 1,736 in situ concrete bored piles and associated works, and drainage installation (to interface with existing systems).

The project also involved the construction of solar steam generator pads, perimeter fencing and roadways and required the relocation of 11KVA cables, fibre optic cables and a fly ash pipeline from the middle of the site.

Related projects

  • CRUSH CREEK SUBSTATION
    Colinsville, Queensland

    The FKG Group was engaged by UGL Engineering to complete the concrete works for the new Crush Creek Substation, which formed part of the network upgrade to integrate new solar farm...

    View full project profile

  • Woleebee CPP
    Woleebee Creek, Queensland

    As part of QGC’s ongoing works to extract coal seam gas (CSG) from the Surat region, they have been constructing a number of central processing plants (CPPs) to aid in processing...

    View full project profile

  • Wandoan Interconnect
    Wandoan, Queensland

    Origin Energy identified a need to construct a conduit for the controlled transfer and meter of LNG from the Surat Basin to Gladstone, as part of the APLNG project. The FKG Group w...

    View full project profile