The FKG Group’s civil team were engaged by Sunwater to complete upgrade works for the Thuraggi Channel in Central Queensland. The team designed and constructed a solution to ...
The Toowoomba Regional Council (TRC) contracted the FKG Group to perform the vertical expansion over the original, unlined ‘Cell A’ at Bedford Street Landfill. The site includes the Council’...
As part of the Toowoomba Regional Council’s (TRC) Gowrie Creek Catchment Management Strategy, a series of flood mitigation works were conducted around the city. These included the construction ...
Following the 2011 floods, the Toowoomba Range experienced landslips requiring an extensive clean-up process. As a result of the floods, a 20m section of high pressure gas pipeline was exposed. ...